Total sales of products in the industry amounted to 902.6 billion rubles in 2016. The total volume of production of aviation industry enterprises (according to operational data) to the level of 2015 was 109.0%, the volume of production of civilian products - 121.2%.
Labor productivity in 2016 increased and amounted to 2015 level, 115.5% or 3625 thousand rubles a year per employee. The average wage increased and amounted to the level of 2015 111.8% or 46245 rubles, including in research and development organisations - 56488 rubles, at serial enterprises - 42624 rubles. The number of employees in the industry has grown and amounted to the level of 2015, 100.7% - 414.2 thousand people.
In 2016, 137 state and civilian aircraft were delivered to customers, including 11 SSJ 100 aircraft for civilian use on the foreign market, 18 SSJ 100s for the domestic market, and 1 aircraft for the IL-96 aircraft. In 2015, 27 aircrafts were delivered.
The development of the aviation industry for 2013-2025," was not achieved.
In 2016, 190 state and civil helicopters were produced, and 1255 aircraft engines were manufactured.
The number of civil aircrafts produced in 2008-2016.
|
2008
|
2009
|
2010
|
2011
|
2012
|
2013
|
2014
|
2015
|
2016
|
Number of produced and delivered long-haul and regional aircrafts
|
10
|
14
|
7
|
11
|
20
|
36
|
38
|
27
|
30
|
June 8 in Irkutsk, the new Russian medium-range aircraft MC-21-300 was rolled out. In the near future, the beginning of flight tests of the aircraft is expected.
In November 2016 the second stage of flight tests at the flying IL-76LL laboratory of the new Russian TRDD PD-14 (a family of promising civil turbofan engines with a thrust of 9-18 tons) began. On December 1, the airplane took off with the prototype of the PD-14 engine No. 100-07 operating at the maximum operating level developed by JSC "UEC-Aviadvigatel". During 2016, under serial production conditions, Perm Motors assembled three new engines, two bulkheads were installed. At the aggregate enterprises development and development in the production of systems for the engine PD-14 continues.
"Sukhoi Civil Aircraft" completed the development of the draft design (Gate 3) of the long version of the SuperJet - SSJ 100SV, designed for 120 passengers. In 2017, at the air show in Le Bourget and at MAKS-2017 the company will be ready to present the aircraft to potential buyers.
As of December 30, 2016 (since the start of the project), 250 serial engines SaM146 have been shipped from PJSC Saturn to JSC GCC and PowerJet. Reliability of departure according to the schedule (on the engine) - 99,92% reliability of departure according to the schedule (in general on the power unit) - 99,88%.
In 2016 two types of training aircraft arrived at the test: CP-10 and Yak-152.
In 2016 it was decided to finance the work on the resumption of production of a turboprop aircraft of local air lines IL-114-300 and a wide-body long-haul IL-96-400M.
At the end of the year, the press service of the AK. S.V. Ilyushin reported the completion of the factory flight tests of the first experienced modernised heavy military transport aircraft Il-76MD-M. By the program of preliminary (factory) tests on the aircraft, 17 flights were performed. In 2017, the aircraft is planned to be presented for state joint tests.
On December 14, in Ulyanovsk, the second stage of the factory tests of the first prototype of the Il-76MD-90A heavy military transport aircraft (Head No.0102) began. The airborne navigation complex was modernised on the airplane, an on-board defence complex and a new-generation on-board communication complex were installed.
In Voronezh, at the VASO plant, intensive work was underway to assemble the first flight prototype of the IL-112V light military transport aircraft. In 2017, it is expected to roll out and the first flight.
Work is underway to create a family of TV7-117 engines for the power plant of the light military transport aircraft Il-112V (engine TV7-117ST) and the power plant for the Mi-38 helicopter and its modifications (engine TV7-117V). In 2016, the working design documentation was developed and Electronic layout of the power plant and propeller, power unit (TV7-117ST) mounted on the stand, adjustment of the bench equipment was performed and the planned test program was performed. In early 2017, giving the engine TV7-117ST delivered to Voronezh for installation on the first IL-112V.
On May 30 in Taganrog, the first serial Be-200BC aircraft was rolled out. Earlier, the assembly of these aircraft was carried out at the facilities of the Irkutsk Aviation Production Association. In 2008, it was decided to transfer production of this type of aircraft to Taganrog. Be-200ChS proved itself during extinguishing fires and rescue operations, including abroad - in Greece, Portugal, France. The plane has passed the procedure of European certification, its certification is planned in the USA.
The work on the creation of a DRLO A-100 aircraft continues. The aircraft is at the stage of development work, the first flight A-100 will make in 2017. The regular Il-76MD-90A transport aircraft for the flying radar A-100 will be produced at the Aviastar-SP plant in Ulyanovsk.
During the year, work continued on the re-equipment of connections and parts of Russian Aerospace Forces for modern models of military equipment. Over a year, more than 350 weapons, military and special equipment were delivered. Among them - Su-35S, Su-30SM, Su-34, helicopters Ka-52, Mi-28N, Mi-26T, Mi-35M, Mi-8AMTSh, S-400 surface-to-air missile systems, anti-aircraft missile-gun complexes "Pantsir-S", various radar stations of radio technical troops. Two modernised Tu-160 missile carriers and two Tu-95MS missile systems entered long-range aviation formations.
At the PJSC "Kuznetsov" began the serial assembly of engines NK-32-02. The first flight of an experienced modernised Tu-160M2 is scheduled for the end of 2018.
In 2016, the design of a prospective TRDD with a thrust of 35 tons - PD-35, began. Beginning of flight tests at the flying laboratory is planned for 2020. It is planned to create the next generation of thrust engines from 20 to 50 tons for wide-body long-haul aircraft. The project is estimated at 180 billion rubles for 10 years, the serial production of new domestic aircraft engines should begin by 2026. First of all, PD-35 is planned to be installed on a promising Russian-Chinese long-range wide-body passenger aircraft.
The development of a prospective engine for the new (5+) generation for the PAK FA of the 2nd stage of development is being continued with the aim of improving the flight performance of the complex, as well as for new and modernised systems of frontline and army aviation, including unmanned aerial vehicles. In 2016, developed working design documentation, operational documentation, manufactured product prototypes, manufactured prototype products for carrying out autonomous tests, demonstrators of a gas generator and engine were made, and tests were carried out.
During 2016, more than 60 new helicopters, including the Ka-52 Alligator, Mi-28N Night Hunter, Mi-35, Mi-8AMTSH Terminator, Mi-26, Ansat-U, came from the manufacturing plants in Part of the army aviation. In October 2016, during the tests of the "demonstrator of high-speed helicopter technologies" (PSV) on the Mi-24 base, a speed of 405 km / h was achieved. The maximum speed of the Mi-28N and Mi-35 is about 300 km / h.
In aircraft engine-building design bureaus and serial plants and in aggregate enterprises, work was also carried out to create a new and modernize the machinery in operation:
- the creation of an engine for the remotorization of Mi-26 (PD-12V) helicopters,
- continued work on the project to create a family of perspective engines for medium and high-speed helicopters (MPE), developed the appearance of units and elements of MPE systems, developed the design of parts, components and components of engine components.
The Ministry of Industry and Trade in 2016 amended the state program of aviation development for 2013-2025. For the implementation of the program in 2016, 55.5 billion rubles were provided, but taking into account the changes introduced, the volume of financing decreased by 1.8 billion rubles.
The Aviation Industry Department of the Ministry of Industry and Trade of the Russian Federation has developed and submitted for wide discussion the Draft Strategy for the Development of the Aviation Industry until 2030. The need to develop a new document is due, first of all, to the fact that since the adoption of the previous Aviation Industry Strategy there have been major changes, both in Russia and the world.